The WINNER Tower is progressing steadily, with 80% of the underground pile cup foundation casting complete and 70% of the water tank walls in the underground floor erected. Basement floor drainage is also 80% complete. Work is actively ongoing with waterproofing of the water tank, steel work for the neck columns, backfilling, plain cement concrete casting for the crane foundation, and basement slab casting.
With cutting-edge design and premium materials at the forefront, WINNER Tower is set to be a symbol of innovation and strength. Stay tuned as this iconic structure continues to rise!