The 1WOOD project is progressing beautifully and right on schedule! Our team has successfully completed the casting of the podium floor slabs, with preparations underway for the 1st floor slab and swimming pool slab. Block works and plastering on the podium floors are in progress, alongside the painting of the podium floors, all contributing to the project’s growing vision. With a focus on sustainability, design, and functionality, we’re creating a space where innovation meets practicality. Stay tuned as 1WOOD continues to evolve into a stunning, eco-conscious masterpiece!