Construction of RA1N is successfully progressing in accordance with the initial plan. So far, we have carried out the following tasks:

  • Super-structural Works (level 16th)
  • Block Works (level 9)
  • Plaster Works (level 7)
  • Electromechanical Works (level 6)
  • Painting Works (level 5)
  • Building envelop Works (level 8)

Сonstruction is going on in accordance with the schedule of construction works.