The construction of RA1N is progressing well according to plan. So far, we have completed the following tasks:
- Finished the ground floor.
- Poured the monolithic slab on the 2nd floor.
- Placed the columns of the 2nd floor.
- Preparing to install the floor slab.
Handover: December 2024.